2” to 3”(51mm to 76mm) of finished asphalt.
1.5” to 2” (38mm to 51mm) of base/primer asphalt
4” to 8” (102mm to 203mm) of crushed aggregate
Wire mesh above or below Heating Cables
3” (76mm)
Spacing
2” to 3” (51mm to 76mm) of finished concrete
2” to 3” (51mm to 76mm) of concrete
4” to 8” (102mm to 203mm) of crushed rock aggregate base
Rebar or wire mesh supported by bricks or metal chairs
Concrete Block
1” to 2” (51mm to 76mm) of finished mortar
Brick and Stone Pavers must NOT be any thicker
than 2.5” (63.5mm).
Heating Cable run (tied to the rebar or wire mesh with zip ties)
4” to 8” (102mm to 203mm) of crushed rock aggregate base
Rebar or wire mesh staked to aggregrate base
2” to 3” (51mm to 76mm) of finished concrete
2” to 3” (51mm to 76mm) of base/concrete
Insulation may be added between base
concrete and the crushed rock aggregate
4” to 8” (102mm to 203mm) of crushed rock aggregate base
Rebar or wire mesh supported by bricks or metal chairs
Concrete Block
3” (76mm)
Spacing
WHCA heater run
WHCA heater run
WHCA heater run
3” (76mm)
Spacing
3.5”- 4” (89-102mm)
Spacing
WSHC heater run
Heating Cable run (tied to the rebar or wire mesh with zip ties)
APPENDIX D:
CROSS-SECTION OF SNOW MELTING CABLE IN CONCRETE
14