beautypg.com

Installation, Dura-vent termination kit – Regency Hampton H35 Large Gas Stove User Manual

Page 23

background image

Hampton® H35-2 Direct Vent Freestanding Gas Stove

23

INSTALLATION

Pipe Length

Round Support

Box/Wall Thimble

Vertical

Terminal

Storm Collar

Flashing

Ceiling

Firestop

*24" Pipe Length

Dura-Vent Horizontal

Termination Installation

Dura-Vent Vertical

Termination Installation

*Adj.Pipe Length

*90 Elbow

o

*Round Support

Box/Wall Thimble

*Horizontal

Termination Cap

Wall Thimble

(B)

Vinyl Siding

Standoff (Optional)

Cathedral

Ceiling

Support Box

(D)

Vertical Termination Kit

(A)

*Horizontal Termination Kit

Dura-Vent Basic

Horizontal Kit
# 46DVA-KHA

1 90

o

Elbow

1 Wall

Thimble

Cover

1 Horiz. Sq. Term. Cap

DURA-VENT TERMINATION KIT

Planning Your Dura-Vent

Installation

There are two basic types of Dura-Vent Direct Vent
System installations: horizontal termination and ver-
tical termination. Confi rm the maximum horizontal
run and maximum vertical rise from the diagrams
in the "Venting Arrangement" section.

When planning your installation, it will be necessary
to select the proper length of vent pipe for your
particular requirements. For horizontal installations,
determine the minimum clearance from the rear of
the unit to the wall. It is also

important to note the wall thickness. (The wall
thimble is suitable for 2 x 4 or 2 x 6 wall construc-
tion.) Select the amount of vertical rise desired for
"vertical-to-horizontal" type installations.

Warning: Always maintain required
clearances (air spaces) to nearby
combustibles to prevent a fi re hazard.
Do not fi ll air spaces with insulation.

The minimum clearance requirements between the
outer wall of the vent pipe and nearby combustible
surfaces is 1-1/4 inch. Be sure to check

the vent termination clearance requirements from
decks, windows, soffi ts, gas regulators, air sup-
ply inlets and public walkways as specifi ed in the
"Exterior Vent Terminal Locations" section and in
your local building codes.

To determine the length of vent pipe required for
vertical installations, measure the distance from the
unit fl ue outlet to the ceiling, the ceiling thickness,
the vertical rise in an attic or second storey, and
allow for suffi cient vertical height above the roof line.

For multi-storey applications, fi re stops are required
at each fl oor level. If an offset is needed, additional
pipe, elbows and supports will be required.

Do not exceed the maximum number of elbows.
One 90

o

for horizontal terminations and two 45

o

for

vertical termination.

Alternate

Horizontal

Termination Caps