Informations, Information, Informationen – Sulky VISION 2 DPB User Manual
Page 83

83
GB
Informations
/
Information
/
Informationen
Problems/Solutions
E
1
4
83
P
ROBLEMS
S
OLUTIONS
The control unit does not switch on
Check
- unit/power supply connections
- power supply cable fuses
Flow rate test
Check
- calibration factor
- that the shutters are open
Repeat the test.
Shutters open to maximum then to minimum
Check
- tractor forward speed coefficient
- spreading width
(24.00 note the position)
The unit switches on but the rams do not move
Check
- fuses
- the battery power supply
The area counter reading is incorrect
Check
- connection / machine
- working width
- drive rate
Flow rate
Check
- programmed flow rate
- fertiliser coefficient
- spreading width
- tractor forward speed
- ram travel
- tramlining
The forward speed is incorrect
Check
- connection on unit
- distance between the detection ring / sensor
- that the detection ring is rotating correctly
- sensor wire continuity
- 100-m coefficient
The tonnage counter reading is incorrect
Check
- connection / machine
- working width
- drive rate
- fertiliser coefficient
- shutter opening/closing