beautypg.com

Beacon 200 – RKI Instruments 12 VDC Beacon 200 User Manual

Page 16

background image

12 • 12 VDC Beacon 200 Operator’s Manual

1. Select the mounting site. When you select the mounting site consider

the following factors:

Is a 12 VDC power source available?

Is there enough room to open the housing door and make wiring
connections through the conduit hubs at the bottom of the housing?

Are the display screen and status lights visible?

2. Close and latch the housing door.

3. Position the monitor on a vertical surface at eye level (4 1/2 to 5 feet

from the floor).

4. The 12 VDC Beacon 200 is shipped with the mounting feet positioned

behind the housing. Loosen the screws that secure the feet to the
housing, rotate the feet to their mounting position (as shown in
Figure 4), then tighten the screws.

5. Insert 1/4 in. or 5/16 in. screws through the slots in the mounting feet at

each corner of the housing to secure the housing to the mounting
surface (see Figure 4).

Mounting
Feet, 4X

Ø .31 x .50 slot, 4X

PILOT

FAIL

.41

3/4 Conduit Hubs (4X)

Buzzer

RESET

ALARM 1

ALARM 2

6.45

10.94

10.50

Reset Switch

8.50

6.00

GAS MONITOR

BEACON 200

Figure 4. 12 VDC Beacon 200 Outline and Mounting Dimensions