2 connection plan, Connection plan, Electrical installation – Lenze EZS3-xxxA200 Sinusoidal filter 180-480A User Manual

Page 29: Danger

background image

Electrical installation

Connection plan

4

l

29

EDKZS3−480A200 DE/EN/FR/ES/IT 1.0

{

Danger!

Dangerous voltage
The leakage current to earth (PE) is > 3.5 mA AC or > 10 mA DC.
Possible consequences:

ƒ

Death or severe injuries when the device is touched in the event
of a fault.

Protective measures:

ƒ

Implement the actions required in the EN 61800−5−1. Especially:
– Fixed installation
– PE connection must conform to standards (PE conductor

diameter

³ 10 mm

2

or PE conductor must be connected twice)

4.2

Connection plan

M

3~

1U1

1U2

1V1

1V2

1W1

1W2

EZS3-xxxA200

xxxx

U

V

W

SSP94SF004