beautypg.com

Commissioning – Lenze SMD 0-37kW-22kW User Manual

Page 21

background image

Lenze 13466184 EDBSL03 v20

EN, DE, FR, IT, ES

19

Commissioning

Code

Possible Settings

IMPORTANT

No.

Name

Lenze

Selection

d25

PI setpoint accel/

decel

5.0 0.0 {s} 999 Sets rate of change for PI setpoint

d38

PI mode

0

0 PI disabled
1 PI enabled: normal-acting

When feedback (terminal 8) exceeds

setpoint, speed decreases

2 PI enabled: reverse-acting

When feedback (terminal 8) exceeds

setpoint, speed increases

d46

Feedback minimum

alarm

0.0 0.0 999

See C08 and c17, selections 9 and 10

d47

Feedback maximum

alarm

0.0 0.0 999

n20

LECOM power up

state

0

0 Quick stop
1 Inhibit

n22

Serial time-out

action

0

0 Not active

Selects controller reaction to serial

timeout

1 Inhibit
2 Quick stop

3 Trip fault

FC3

n23

Serial fault time

50

50

{ms}

65535 Sets the serial timeout length

This manual is related to the following products: