Mounting steps, Mp 1000(s) dvi / mp 1050(s) dvi, Mechanical installation – Lenze MP 9000 DVI Operating Instructions User Manual
Page 26
Mechanical installation
Mounting steps
MP 1000(s) DVI / MP 1050(s) DVI
l
26
BA_MP9000DVI DE 4.0
5.3
Mounting steps
5.3.1
MP 1000(s) DVI / MP 1050(s) DVI
How to perform the installation:
1. Cut the mounting cutout into the control board (
¶ 25).
2. Check that the gasket under the front panel is located correctly.
3. Place the device in the mounting cutout and secure it against falling−down with one
hand.
4. Fit all screw clamp fixings as explained below:
ELx7xx−011
– Insert the screw clamp fixing into the slot in the housing of the device (see above
figure).
– Press the screw clamp fixing downwards, tilt it towards the housing and check
that it has firmly snapped into place.
– Tighten the screw clamp fixing hand−tight with a screwdriver.
5. Check that the device is securely located in the mounting cutout and that the front
panel gasket is located correctly.
– If necessary, realign the device/gasket.
– If the gasket is not located correctly, protection class IP65 is not achieved on the
front of the device!