Dealer preparation check list – Bush Hog MPG 600 User Manual
Page 5

DEALER PREPARATION CHECK LIST
PLUGGER
BEFORE DELIVERING MACHINE — The following check list should be completed.
Use the Operator’s Manual as a guide.
r
1. Assembly completed.
r
2. All fasteners torqued to specifications given in Torque Chart.
r
3. All decals in place and readable. (See decal page.)
r
4. Overall condition good (i.e. paint, welds)
r
5. Operators manual has been delivered to owner and he has been instructed on
the safe and proper use of the implement.
Dealer’s Signature
THIS CHECKLIST TO REMAIN IN OWNER’S MANUAL
It is the responsibility of the dealer to complete the procedures listed
above before delivery of this implement to the customer.
3
This manual is related to the following products: