Feiss OL7513 User Manual
Ol7513, Assembly instructions for
IMPORTANT
TURN OFF THE POWER AT THE MAIN FUSE OR
CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly. Bulb
not included.
1. Gently pull supply wires out from ceiling outlet box.
2. Attach mounting strap securely to ceiling outlet box with
two machine screws (supplied with outlet box) through slot
at each end of mounting strap. Note: mounting strap should
be installed with "GND" imprint and/or two dimples facing
down.
3. Fasten one hex nut about 3/4" (19 mm) down from one end
of threaded pipe. Then screw same end of threaded pipe into
center hole in mounting strap. At this point test install the
main frame onto ceiling through this threaded pipe and make
certain 3/8" (10 mm) of pipe protrude below. If not, then
adjust the threaded pipe location by screwing up or down
accordingly. Once correct threaded pipe location has been
adjusted, remove main frame and tighten hex nut against
mounting strap. Make certain not to spin threaded pipe
during tightening.
4. Spread the electrical wires so that the black wires are on one
side of the outlet box and the white wires are on the other
side.
5. Electrical connections:
Connect the white wire from the fixture to the white wire of
the outlet box.
Connect the black wire from the fixture to the black wire of
the outlet box.
NOTE: Black outlet box wire may be red, round & smooth
and/or have copper conductor. White outlet box wire may be
square & ridged and/or have a silver conductor.
6. Grounding Connection:
Connect fixture ground wire (without insulation) to ground
wire from outlet box (usually with green insulation) with
wire connector (not provided).
Note: If there is no supply ground wire at outlet box then
attach fixture ground wire securely onto green grounding
screw located at mounting strap.
IMPORTANT: Never connect ground wire to black or white
supply wires (from outlet box).
7. Place main frame through top threaded pipe so that it sits
flush against ceiling. Be sure all wires are tucked inside.
Secure main frame to ceiling by fastening lock washer and
coupler onto top threaded pipe.
Note: Coupler must turn at least 3 times, if it does not you
must remove coupler and lengthen threaded pipe accordingly.
8. Install long threaded pipe by screwing into bottom of coupler.
Note correct position of center pipe at illustration.
9. Install bulb (not included). See relamping label located at
socket area for type and maximum allowed wattage.
10. A. Slip glass shade through long threaded pipe until it checks
inside of main frame. Then slip cover and lock into position
by fastening with hex nut. Do not over tighten.
B. Install finial.
Assembly Instructions For
OL7513
(E) 5/09
3
2
1
4
5
6
9
7
8
10B
10A