Feiss P1117 User Manual
P1117, Assembly instructions for
(E) 10/07
IMPORTANT
TURN OFF THE POWER AT THE MAIN FUSE OR CIRCUIT
BREAKER BOX BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly. Bulb not included.
1. STEM HUNG INSTALLATION:
A. Choose desired installation height from dimensions shown in above
diagram. Thread fixture wire through each stem to be used. Please note
correct position of stems from left diagram. Screw all stems together until
secure. Then screw bottom end of stem assembly onto fitter.
FLUSH MOUNT INSTALLATION:
A. Remove stem attached above fitter. Make certain to keep threaded pipe
protruding above fitter.
B. Thread fixture wires, which are located above fitter, through swivel.
C. Screw fitter into swivel.
2. Measure 6" of wire from end of canopy and cut off remaining wire. Split
wires and strip off 3/4" of insulation from each end.
3. Follow enclosed “Multiple Standard Installation Instructions” for electrical
and fixture installation onto ceiling outlet box.
4. Place shade over threaded socket then spacer tube and secure with
counter ring.
5. Install light bulb (not included). See relamping label at socket area for type
and maximum allowed wattage.
Assembly Instructions For
P1117
Ball Cap Nut
Mounting Plate
Mounting Screw
Fixture plate
(canopy)
Stems
(3) 12 in. long
(1) 6 in. long
Socket
Fitter
Shade
Bulb
(not included)
Swivel
9"
45"
39"
51"
21"
27"
33"
15"
Spacer Tube
Counter Rng