Feiss P1221 User Manual
P1221, Assembly instructions for
IMPORTANT
TURN OFF THE POWER AT THE MAIN
FUSE OR CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly. Bulbs not included.
1. STEM HUNG INSTALLATION:
A. Choose desired installation height. Thread
fixture wires through each stems to be used.
Note correct position of stems from left
diagram. Screw all stem together until secure.
Screw bottom stem into fixture stem until
secure.
B. Thread fixture wires from top stem through
canopy. Install top end of stem assembly by
screwing into canopy.
WITHOUT STEM INSTALLATION:
A. Thread fixture wires from top of fixtuere
stem through canopy. Then screw canopy on top
of fixture stem.
2. Cut excess wires leaving only 6" (15 cm) length
of wires above canopy. Split fixture wire into
two strands. Then strip off 3/4"(19 mm) of outer
plastic insulation.
3. Follow enclosed supplement installation
instructions for electrical and fixture installation
onto house outlet box. If you do not have an
outlet box at desired location to attach the
fixture then hire a qualified electrician to create
one.
4. Install shade by fastening with counter ring.
5. Install light bulb (not included). See relamping
label at socket area for type and maximum
allowed wattage.
Assembly Instructions For
P1221
(E) 12/10
5
4
1
3
2