Feiss F1798 User Manual
E) 07/14
IMPORTANT
TURN OFF THE POWER AT THE MAIN
FUSE OR CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
beginning assembly. Bulb not included.
1. Opens arms so they are equally spaced to each
other. Then fasten ball cap nuts through holes
in arms into top center body.
2. Carefully thread fixture wire though fixture loop.
Screw fixture loop to top threaded pipe.
3. Place candle tubes over candelabra sockets and
screw bulb (not included) into place to secure.
See relamping label on candle tube for type and
maximum allowed wattage.
4. Follow enclosed “Chain Suspended Installation
Instructions” for electrical and fixture installation
onto ceiling outlet box.
5. Hang all crystal drops as shown on drawing.
(E) 07/14
ASSEMBLY INSTRUCTIONS FOR F1798/6
- VS3900_ (4 pages)
- VS4000_ (4 pages)
- VS50003 (4 pages)
- VS4200_ (4 pages)
- VS43003 (4 pages)
- VS44001 (4 pages)
- VS45003 (4 pages)
- VS46002 (4 pages)
- VS47002 (4 pages)
- VS48001 (4 pages)
- VS52002 (4 pages)
- VS53001 (4 pages)
- VS53002 (4 pages)
- WB1701 (4 pages)
- WB1703 (4 pages)
- WB1704 (4 pages)
- VS36003 (4 pages)
- VS36004 (4 pages)
- WB1702 (4 pages)
- WB1705 (4 pages)
- VS38001 (4 pages)
- VS38002 (4 pages)
- VS3100_ (4 pages)
- VS15901 (1 page)
- VS17401 (1 page)
- VS17802 (1 page)
- VS18201 (1 page)
- VS18401 (1 page)
- VS18501 (1 page)
- VS18702 (1 page)
- VS18902 (1 page)
- VS18903 (1 page)
- VS28001 (1 page)
- VS29001 (1 page)
- VS26001 (1 page)
- VS18904 (1 page)
- VS27001 (1 page)
- VS3200_ (4 pages)
- WB1598 (4 pages)
- VS3400_ (4 pages)
- WB1597 (4 pages)
- WB1601 (4 pages)
- WB1603 (4 pages)
- WB1606 (4 pages)
- WB1607 (4 pages)