Feiss F2280 User Manual
Assembly instructions for

(E) 10/07
IMPORTANT
TURN OFF THE POWER AT THE MAIN FUSE OR
CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly.
Bulb not included.
1. Spread open all arms so that they are equally spaced
apart to each other.
2. Carefully thread fixture wires through fixture loop.
Screw fixture loop onto top threaded pipe until secure.
3. Screw threaded pipe into a finial. Then slip the same
threaded pipe through cover and center plate. Lock all
together by fastening with another finial from above .
4. Follow enclosed “Chain Suspended Fixture Installation
Instructions” for electrical and fixture installation onto
ceiling outlet box.
5. Place Shade over threaded socket then spacer tube and
secure with counter ring.
6. Install light bulb (not included). See relamping label at
socket area for type and maximum allowed wattage.
Assembly Instructions For
F2280/6
Arm
Finail
(small)
Finial
(large)
Center
Plate
Bulb
(not included)
Counter
Ring
Shade
Spacer Tube
Socket
Threaded Pipe
(large)
Cover
Fixture Loop
1
2
5
6
4
3