Feiss F2568-3 User Manual
Assembly instructions for

IMPORTANT
TURN OFF THE POWER AT THE MAIN FUSE OR
CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly.
Bulbs not included.
1. Choose desired installation height from dimensions
shown in above diagram. Thread fixture wire through
each stem to be used. Please note correct position of
stems from left diagram. Screw all stems together until
secure.
2. Slip fixture loop through fixture wires, then install by
screwing on top of stems.
3. This fixture is supplied with a threaded chain link. The
link is opened and closed by twisting cylinder on chain
link. The threaded chain link should be installed onto the
fixture loop and the other should be installed onto the
canopy loop.
4. Follow enclosed supplement installation instructions for
electrical and fixture installation onto house outlet box.
If you do not have an outlet box at desired location to
attach the fixture then hire a qualified electrician to
create one.
5. Install bulb (not included). See relamping label located
near socket area for type and maximum allowed
wattage.
6. Place glass plate onto frame and secure with washer and
knob.
Assembly Instructions For
F2568/3
(E) 12/09
1
2
3
4
5
6