Feiss F2504-3 User Manual
Assembly instructions for, X1 1
IMPORTANT
TURN OFF THE POWER AT THE MAIN FUSE OR
CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly. Bulbs not
included.
1. Loosen the ball cap screws (at top) and finial (at bottom), then
gently slide out the inner assembly from outer assembly.
2. Slide fixture loop down through the fixture wires, and then screw
on top of fixture.
3. Follow enclosed supplement installation instructions for electrical
and fixture installation onto house outlet box. If you do not have
an outlet box at desired location to attach the fixture than hire a
qualified electrician to create one.
4. A. Install candle tube by slipping through sockets.
B. Install type-B, candelabra base, of 60 Watt maximum bulbs (not
included).
5. A. Slip outer assembly through inner assembly, and secure them
at top section by fastening with ball cap screws.
B. Secure bottom section of the outer assembly by fastening with
the finial.
6. Install lower assembly by hooking onto finial. NOTE: Bend tight
open hook in order to prevent from getting loose.
7. Hang all crystal glass parts as shown on drawing.
NOTE:
A. For easier installation of crystal chains #3, hook all chains first
onto the lower assembly and then proceed to hook onto the
middle assembly.
B. To replace broken crystal or pin, extras are included in
hardware bag. Replace by gently bending open pin, remove broken
crystal or pin, hook new one, then close back pin. Avoid bending
pin into sharp angle.
Assembly Instructions For
F2504/3
Outer
Assembly
Bulb
(not included)
Fixture Loop
(E) 5/09
Candle
Tube
Finial
Fixture Wires
Inner Assembly
Lower
Assembly
Ball
Cap Screw
FACTORY INSTALLED
1
9
3
7
6
2
4
8
5
x1
1
Extra
1
3
1
Required
x8
x8
2
1
4
3
12
6
6
6
12
30mm
18mm
12mm
5
6
7
22mm
8
9
28mm
16
Used on # 6,
7, 8, 9
Rectangular
Crystal Hook
PIN
DESCRIPTION
S Hook
Small Bead
Hook
Extra PIN
Qty.
4
4
8
8
PIN PART
Used on # 5