Feiss SF213 User Manual
E) 9/05
(E) 9/05
ASSEMBLY I NSTRUCTI ONS FOR SF213, SF214
M U R R A Y F E I S S
©MURRAY FEI SS I MPORT LLC.
Bulb
(not included)
Socket Assembly
Lock Washer &
Hex Nut
Glass Shade
Arm
Long Threaded Pipe
Hex Nut
Washer
Center Column
Cap
Finial
Fixture Plate
IMPORTANT
TURN OFF POWER AT MAIN FUSE OR
CIRCUIT BREAKER BOX BEFORE
STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly. Bulbs are not included.
1. Take fixture wires and ground wire exiting above
center pipe and thread through fixture plate, lock
washer, and hex nut. Then while removing any slack
of wires in between parts, lock all together by
fastening hex nut.
2. Screw the long threaded pipe into coupler located
at bottom of socket assembly. Note correct position
of threaded pipe at illustration.
3. Follow enclosed “Multiple Standard Installation
Instructions” for electrical and fixture installation
onto ceiling outlet box.
4. Install bulbs (not included). See relamping label
located at socket area for type and maximum
allowed wattage.
5. Spread open all arms so they are evenly spaced
to each other.
6. Slide glass shade through the long threaded pipe
until it rests onto bottom section of arms. Secure in
position by fastening with a washer and a hex nut.
Do not over tighten.
7. Slip cap and fasten finial onto threaded pipe.