Feiss FM313 User Manual
Fm313, Assembly instructions for
IMPORTANT
TURN OFF THE POWER AT THE MAIN FUSE OR
CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all parts before
assembly. Bulb
not included.
1. Attach mounting bar securely to ceiling junction box with
two machine screws (supplied with junction box) through
slot at each end of mounting bar. Note: mounting bar should
be installed with "GND" imprint and/or two dimples facing
down.
2. Fasten one hex nut about 3/4" (19 mm) down from one end
of threaded pipe. Then screw same end of threaded pipe into
center hole in mounting bar. At this point test install the main
frame onto ceiling through this threaded pipe and make
certain 3/8" (10 mm) of pipe protrude below. If not, then
adjust the threaded pipe location by screwing up or down
accordingly. Once correct threaded pipe location has been
adjusted, remove main frame and tighten hex nut against
mounting bar. Make certain not to spin threaded pipe during
tightening.
3. Spread the electrical wires so that the black wires are on one
side of the outlet box and the white wires are on the other
side.
4. Electrical connections:
Connect the white wire from the fixture to the white wire of
the outlet box.
Connect the black wire from the fixture to the black wire of
the outlet box.
NOTE: Black outlet box wire may be red, round & smooth
and/or have copper conductor. White outlet box wire may be
square & ridged and/or have a silver conductor.
5. Grounding Connection:
Connect fixture ground wire (without insulation) to ground
wire from outlet box (usually with green insulation) with
wire connector (not provided).
IMPORTANT: Never connect ground wire to black or white
power supply wires.
6. While making certain all electrical wires are tucked inside of
main frame, install the main frame by fastening with a lock
washer and coupler onto the top threaded pipe.
7. Install a hex nut onto one end of center pipe leaving about
3/8" (10mm) thread exposed. Screw same end of pipe into
coupler. Tighten hex nut.
8. Install bulb (not included). See relamping label located at
socket area for type and maximum allowed wattage.
9. Install shade by slipping through the installed center pipe and
then fastening with finial. IMPORTANT: Do not over tighten.
Assembly Instructions For
FM313
Mounting Bar
Outlet Box
Mounting Screw
Socket
Bulb
(not included)
Outlet Box
Supply Ground Wire
Supply Wire
Fixture Wire
Fixture Ground Wire
Shade
Main Frame
Lock Washer
Coupler
Finial
(E) 12/08
Center Pipe