beautypg.com

Technical data, Service and inspection – EUCHNER ESM User Manual

Page 5

background image

Operating Instructions Read Heads/Actuators for Safety Relays ESM

Subject to technical modifications; no r

esponsibility is accepted for the accuracy of this information.

© EUCHNER GmbH + Co. KG

096881

‑10

‑12/13 (translation of the original operating instructions)

Technical data

Parameter

Value

Read heads
Housing material

Fiber glass reinforced PPS

Ambient temperature

‑20 ... +60 °C

Degree of protection

according to EN 60529

IP 67

Installation position

Any, alignment with actuator

should be kept in mind (markings)

Connection

Molded cable with crimped fer‑

rules/plug connector M8, 4‑pin/

molded cable with plug connector

M12, 8‑pin

Switching voltage

35 V DC

Switching current I

e

max.

0.1 A

Built‑in fuse

100 mA (per safety contact)

Rated conditional

short‑circuit current

1)

100 A

Contact status indication (only CMS‑R‑AZA)
Switching voltage

35 V DC

Switching current I

e

max.

0.02 A

Switching frequency f

max

at I

min

10 mA

1)

5 Hz

Switching frequency f

max

at nominal current 8 A

1)

0.1 Hz

Switching delay

from state change

1) 2)

26 ms

Method of operation

Magnetic, reed contact

Mechanical life

100 x 10

6

operating cycles

Vibration resistance

10 ... 55 Hz, amplitude 1 mm

Shock resistance

30 g/ 11 ms

EMC compliance

According to EN 60947‑5‑3

Center offset m from actuator ± 2.5 mm

at a distance of s = 3 mm

Switch‑on distance s

ao

See combination options table

Switch‑off distance s

ar

Switching contacts
Classification according to EN 60947‑5‑3
CMS‑R‑BZB…

M3D36AS1

CMS‑R‑AZA…/CMS‑R‑AZC…

M3D88AS1

Fusing of the power supply and the safety contacts
External contact fuse

1)

Fuse 10 A gG

Actuator
Housing material

Fiber glass reinforced PPS

Ambient temperature

‑20 ... +60 °C

Degree of protection

according to EN 60529

IP 67

Installation position

Any, alignment with read head

should be kept in mind (markings)

Method of operation

Magnetic

Vibration resistance

10 ... 55 Hz, amplitude 1 mm

Shock resistance

30 g/ 11 ms

Center offset m

from read head

± 2.5 mm

at a distance of s = 3 mm

Switch‑on distance s

ao

See combination options table

Switch‑off distance s

ar

Reliability values acc. to EN ISO 13849‑1
Category

1)

4

Mission time

20 years

Performance Level

1)

e

B

10d

20 x 10

6

operating cycles

1) Parameter dependent on the evaluation units ESM‑BA2.. and

ESM‑BA3..

2) Corresponds to the risk time according to EN 60947‑5‑3. This

is the maximum switch‑off delay for the safety outputs following

removal of the actuator.

X

Y

Z

Alignment

marking

Approach

direction

X

Y

Z

Approach

direction

Alignment

marking

Design CMS‑.‑A...

Design CMS‑.‑B...

Figure 1: Alignment of read head and actuator

Service and inspection

Remove iron swarf from the read head and actuator

at regular intervals.

Only use solvent‑free detergents for cleaning the

actuators and read heads!

Regular inspection of the following is necessary

to ensure trouble‑free long‑term operation:

f

correct switching function

f

secure mounting of components

f

loose connections.

In the event of damage or wear and tear, the

damaged system component must be replaced.

Exclusion of liability under the following

conditions:

f

incorrect use

f

non‑compliance with safety regulations

f

installation and electrical connection not per‑

formed by authorized personnel

f

failure to perform functional checks.