Overview of this manual – ETC Sensor+ Portable Pack CEM+ to CEM3 Retrofit User Manual
Page 5

Introduction
3
Overview of this Manual
Reference this manual throughout the retrofit procedure.
•
- emptying the rack and removing the external components
•
Remove the CEM+ Backplane, page 8
- remove the existing backplane from the pack
•
Replace Phase A Bus Bar, page 9
- remove the old bus bar and install a new one
•
Attach New Power Harness, page 10
- install and secure the power wire harness
adapter
•
Install CEM3 Backplane, page 10
- install the new backplane and connect and secure
the data cabling
•
Replace AF Cards (AF Packs Only), page 12
- remove the existing Advanced Feature
cards and install the new ones
•
Install New Pack Lid and Reassemble Pack, page 13
- install the new pack lid and
reassemble the external components
When viewing this document in electronic form (.PDF file) with Adobe Acrobat Reader, blue
italicized text followed by a page number such as “
Overview of this Manual, page 3
” is a
link within the document. By clicking on the link, you can jump to that section or topic.