Operator’s instructions, Winch line blower installation procedure – Condux Winch Line Blower System User Manual
Page 7

CONDUX WINCH LINE BLOWER
5
2. Operator’s Instructions
Winch Line Blower Installation Procedure
!WARNING: Do not use around live circuits. The Winch Line Blower is constructed
of steel and aluminum, as such is highly conductive. Electric shock may occur is
contact is made with live circuits. Always be certain that power has been
disconnected.
!CAUTION: Standard utility service access vault opening procedures must be
followed which include work area protection and gas detection. Hard hats, eye
and ear and foot protection, must be worn whenever working in utility service
access vaults.
1.
Clean out the end of the conduit to remove any dirt or gravel that may get between
the conduit and the threaded adapter.
2.
Place about ½ quart of cable pulling lubricant (such as Poly J ) into the conduit.
While this is not required, it does help in installing the missile and helps to increase
the efficiency of the winch line blower.
3.
Attach the missile to the end of the winch line using the connector supplied with the
winch line blower. (See Fig. 1) The large metal disc must be forward in the direction
of winch line travel (as shown by the label on the missile).
Figure 1: ATTACH THE MISSILE