Installation instructions – AMMCO 40111 Environmental Lathe Enclosure Conversion Kit User Manual
Page 10
10 •
Important: Always read and follow operating instructions.
Installation Instructions
Installation — 95000223 & 95000224 Kits
1.
(95000224 Kit Only) Remove the foot switch cable
from the old electrical box so it can be wired into the
new system. Remove the old electrical box assembly
along with the hood switch. These will not be used with
the new system.
2.
Position the control box on the back of the enclo-
sure as shown in picture below; with the edge of the
box approximately 15-inches from the center of the fan
and 10-inches down from the hinge center line. Remove
the four screws holding the cover on the control box,
and mark the four holes to be drilled in the enclosure.
Drill 9/32-inch diameter holes and use the 1/4-inch
screws, nuts, and washers provided to attach the box.
Positioning Control Box For Installation
3.
Remove the cover from the start/stop pushbutton
switch. Position the switch as shown in the picture
below with the top of the box approximately 10-inches
down from the top of the enclosure base, at the right
end of the enclosure. Mark and drill two 0.203-inch
diameter holes and use the #10 screws and nuts to
mount the switch. Reinstall the switch cover.
Positioning Switch For Installation
4.
Replace the existing emergency switch (95000224
Kit Only) on the enclosure with the one that is wired to
the new control box. Diassemble the switch as shown
in picture below, noting how it comes apart. Insert the
red button from the outside of the enclosure through
the new yellow decal and into the enclosure. Slide the
square washer onto the threaded portion so the washer
corners bite into the plastic. Screw the nut on the back
side of the switch from inside the enclosure with the
white arrow on the switch barrel pointing up. Make
sure the decal is right-side up before tightening the nut.
Route the new, longer cable in place of the existing
cable in the hood. Slide the rear portion of the switch
onto the backside of the installed button and move the
red lever to lock the two pieces together. Then, use the
white clip to lock the lever in place. Insert the cable end
with the stripped wires to the terminal block Wire the
emergency stop switch, to the control box as shown in
the wiring schematic and picture. Tighten cable connec-
tor screws. Tighten the cable connector screws. Use
the cable ties to fasten the new cable.
Diassemble Emergency Switch For Installation
5.
Place the pedal warning decal on top of the foot
pedal frame so it can be read from the front of the
pedal.
6.
Place the warning/caution decal on the large chip
shield.
7.
See picture to position the new hood switch at the
left end of the enclosure. Press “Z” bracket into corner
of hood as shown. Drill two 0.203-inch diameter holes
thru this hood. Attach bracket to hood, and switch mag-
net to bracket.