Putting into operation, Check for operational readiness, 4 putting into operation – ADS-TEC VMT7010/7012/7015 User Manual
Page 17: 1 check for operational readiness, Attention

VMT7010/VMT7012/VMT7015
16
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
4 Putting into operation
4.1 Check for operational readiness
Check the device to determine whether hidden damages have been caused by improper transport,
incorrect operation / storage conditions or improper handling. If damages are found, immediately shut
down the device and protect it against unintentional startup.
The power supply connection and the device interfaces are located in the service slot.
It has to be removed in order to connect the power supply lead and the interface cables.
All supply leads and all required data leads have to be connected before commissioning.
ATTENTION
The device may only be switched on after
acclimatising to the ambient temperature in order
to avoid condensate accumulation.
ATTENTION
The device must be switched off before
connecting or disconnecting any cables in order
to prevent damage to the electronics. Make sure
to meet the permissible voltage for this device.
After switching off and before switching on you
must wait for at least 5 seconds.
Information:
The shielding of a data cable must always be connected with the connector
housing (EMC).