2 cable installation, 3 order of steps during commissioning, 4 check for operational readiness – ADS-TEC OPC6115/6315 User Manual
Page 19
OPC6115/6315
18
© ads‐tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden‐Echterdingen
5.2 Cable installation
The interfaces as well as power supply plugs for the device are accommodated in the device service slot.
5.3 Order of Steps during Commissioning
•With 24V DC devices: Connect the power supply cable with the terminals by using cable end sleeves
•Connect cable for serial / parallel data transmission and fasten the screws between the connector plug and
socket
•Plug in all other required cables and protect from accidental disconnection
Pos: 19 /Datentechnik/Inbetriebnahme/Betriebsbereitschaft prüfen/Betriebsbereitschaft prüfen für OPC/CPC/PLC/OTC/ITC/VMT-Serie(+Monitore) / IPC 5100/5500/2400/1100 @ 0\mod_1158905578361_6.doc @ 381 @
5.4 Check for operational Readiness
Check the device for any hidden damage potentially caused by improper transport, operating or storage
conditions or by improper use or handling (e.g. smoke development from the device, etc.). If any damage is
detected, the device must be put out of service immediately and protected from accidental switch‐on.