Platform installation, 6 machine shut down and park, Platform installation -10 – JLG 41AM Operator Manual User Manual
Page 54: Machine shut down and park -10
SECTION 4 - MACHINE OPERATION
4-10
– JLG Lift –
3121211
Platform Installation
1. Using two people or suitable lifting equipment, lift
platform and set platform upper support rail into the
upper platform mount on the mast.
2. Swing platform lower support rail into lower platform
mount on the mast.
3. Secure platform support rails with two (2) platform
upper mount pins, and two (2) lower platform mount
pins.
4.6
MACHINE SHUT DOWN AND PARK
1. Ensure platform is fully lowered, turn key switch to
OFF position.
2. Store outrigger beams in stowage sockets.
3. Move machine to a well-protected and well-ventilated
area. In a hostile environment, cover machine for pro-
tection.
4. Apply caster brakes and chock at least two wheels
when parking machine for extended time.
5. Remove key switch to disable machine from unau-
thorized use.