SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2-6

– JLG Lift –

3121211

4. Base Frame - Components properly secured, no loose

wires dangling below base; bubble level in place and
functioning properly.

5. Tilt Back Assembly - (36AM/41AM Models Only) Prop-

erly secured; no parts missing i.e.. safety pins, gas
spring cylinder(s), caster wheels, etc.

6. Battery/Charger Box Assembly - (DC Voltage

Machines) Proper battery electrolyte level, no cable
corrosion. Battery box pivots freely when machine is
tilted for transporting (36AM/41AM Models Only).

7. Outrigger Interlock Indicator LED’s - See note

above.

8. Outrigger Sockets - Outrigger lock/release pins in

place and secure, no visible damage. Outrigger inter-
lock contacts (inside outrigger sockets) secure and
clean.

9. Outrigger Beams - Outrigger interlock contacts prop-

erly installed and clean (on bottom of outrigger
assembly). Leveling jacks secure to the outrigger
assembly, lubricated and functioning properly.

10. Motor/Pump/Reservoir Power Unit - No evidence of

hydraulic leaks. Check that hydraulic reservoir fluid
level is filled to the "Fill to Line" mark on the side of the
reservoir.

11. Manual Release Control Valve - See note above.

12. Ground Controls - Key switch operable, placards

secure and legible; emergency stop switch, properly
set for operation.

13. Mast Assembly - Inspect mast chains or cables as per

note above.

14. Platform Rail Installation - Entry gate/bar in proper

working order.

15. Platform Assembly - Secure to mast; Control and

power cables properly tensioned and seated in control
cable sheaves; control cable sheaves rotate freely.

16. Platform Controls - Placards secure and legible,

emergency shut-off button set for operation. Opera-
tors manual enclosed in manual storage tube.