JLG 4017PS Operator Manual User Manual
Page 107

Section 5 - Attachments and Hitches
5-15
31200753
This installation procedure is designed for one-person operation.
1. Tilt attach forward to provide clearance. Check to
be sure lock pin is disengaged.
2. Align quick attach point with opening in
attachment. Raise boom slightly to engage quick
attach point in opening.
3. Tilt quick attach back to engage attachment.
4. Press and hold button (1) and at the
same time push roller switch down (2) to
engage lock pin or push roller switch up
to disengage lock pin.
5. Raise boom to eye level and visually check that the lock pin protrudes through
the attachment hole. If the pin does not protrude through the attachment hole,
place the attachment on the ground and return to step 2.
6. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic
Operated Attachment” on page 5-22.
OAM2290
OAM2300
OAM2310
2
1
OB0250