JLG X17J Operator Manual User Manual
Page 154

X17JR0420113
150
BOOM LIFT MODELS X17J
JLG
POS I BR
If OFF, the turret is rotated in the area above the engine.
POSCILIND
If ON, the first arm is at a sufficient height to avoid any interference with the engine.
SJIBT
If ON, the jib lever on the distributor on the ground is operated.
RETE ELET
If ON, the machine is connected to the mains power supply.
START M. ELE
If ON, the electric motor start button on the ground position is pressed.
SLC SRC
If ON, the rotation or basket levelling lever on the distributor in the basket is operated.
SIIIB
If ON, the third arm lever on the distributor in the basket is operated.
SDIB
If ON, the first arm descent lever on the distributor in the basket is operated.
SSIB
If ON, the first arm ascent lever on the distributor in the basket is operated.
SJIB
If ON, the jib lever on the distributor in the basket is operated.
SEXT
If ON, the extension arm lever on the distributor in the basket is operated.
SRTS
If ON, the aerial part rotation lever on the left side of the distributor in the basket is
operated.
SRTD
If ON, the aerial part rotation lever on the right side of the distributor in the basket is
operated.