5g g – Eppendorf Biological Shakers Excella E-25R User Manual
Page 18
18
M1353-0050
Excella
®
E-25/E25R Classic Incubator Shakers
Operating Manual
5
5
G
G
E
E
T
T
T
T
I
I
N
N
G
G
S
S
T
T
A
A
R
R
T
T
E
E
D
D
5.1 Installation of Platform
A platform is a separate item that is required for operation. The E-25 and E-25R can
be used with a wide variety of New Brunswick 46 x 76 cm (18 x 30 in)
platforms, which
will accept a variety of clamps for flasks test tubes, etc. See Section 9, Replacement
Parts & Accessories, for details.
A platform must be installed on the shaker prior to use.
The shaker is shipped with the four Allen (hexagonal, countersunk) head platform screws
installed in the subplatform of the bearing housing. These screws must be removed
before installing a platform. The Allen (“hex”) wrench is provided.
1. Using the 7/32-inch hex wrench provided, remove and set aside the four Allen head
platform screws from the upper bearing housing (see Figure 3).
Figure 3: Platform Screw Locations
1 Platform
screws
2. Place the platform on the upper bearing housing, aligning the mounting holes of the
platform with the platform screw locations.
3. Insert the four platform screws previously removed and, using the hex wrench,
tighten them to secure platform.
1
1