Flashing Light (option)

Figure 7.19 - Flashing Light

Vi sually check the op tional flash ing light, to see
that the light flashes at ap prox i mately one flash per
sec ond when the mo tor key switch is turned on.

Ground Control Switches

Figure 7.20 - Ground Control Switches

With the Ground/Platform Selector  set to
ground:
Check that each of the platform moving switches
(€ through to ƒ) cause the MHP15J to move the
way it should.

Check both po si tions of each switch.

For cor rect op er at ing pro ce dures see the “Op er a -
tion” chap ter 8.

NOTE

Pay particular attention to the Emergency Stop
switch
„ to see that it turns the MHP15J engine
off when the red cover is struck.

Emergency Lower

Lower control box

Figure 7.21 - Emergency Lower Valve

With the booms raised open the Emergency
Lower Valve
on the top of the manifold valve.

The booms should be gin to lower. The rate of low -
er ing can be reg u lated by the amount the valve is
opened.

To check the slew func tion when us ing the man ual
emer gency lower valve the Mas ter Key Switch
and Emer gency Stop switch must be on and the
Plat form/ground Se lec tor must be set to ground.

To slew (with the man ual emer gency lower valve
al ready open) se lect the re quired di rec tion on the
slew tog gle switch .

NOTE

The manual emergency lower valve must be
closed after the test to ensure proper boom
operation.

For cor rect emer gency low er ing op er at ing pro ce -
dures see “Emer gency Op er a tion” chap ter 9.

Upper control box

Emer gency lower from the up per con trol box is
achieved by turn ing the up per con trol to on and de -
press ing the foot switch whilst op er at ing the Emer -
gency Lower
switch

To slew the unit se lect the di rec tion re quired on the
slew tog gle switch at the same time. For cor rect
emer gency low er ing op er at ing pro ce dures see
“Emer gency Op er a tion” chap ter 9.

page 7 - 6

MHP15J – 11995A

7. Pre-operational Inspection