Be gin at the sec tion en ti tled "Starting From Ground
Con

trol Box", if you in

tend to start and run the

EPV16J from the ground sta tion.

Be gin at the sec tion en ti tled "Starting From Plat -
form Con trol Box", if you in tend to start and run the
EPV16J from the plat form.

Starting From Ground Control Box

Be fore you be gin to op er ate the EPV16J from the
ground con trol box, a qual i fied op er a tor must per -
form the "Pre-op er a tional In spec tion" as de scribed
in chap ter 7, of this man ual.

To start the en gine from the ground con trol box do
the fol low ing:

1. Set the Emergency Stop switch  to ON

(see Figure 8.3).

Figure 8.3

Figure 8.3 - Ground Control Box Starting

2. Set the Platform/Ground Selector switch €

to GROUND (see Figure 8.3).

3. Insert the key  (see Figure 8.3) into the

Master Key Switch and turn the key on.

4. If the engine is at ambient temperature

(cold), hold the Choke / Cold Start Switch

‚ (see Figure 8.3) up throughout the next
step.

5. Turn the key to Start and hold it there un til

the en gine starts or for a max i mum time of 6
sec onds. When the en gine starts re lease the
key  and the choke switch ‚, if you used it
(see Figure 8.3).

If the engine does not start in 6 seconds turn
the key off and release the choke. Wait 60
seconds before trying to restart the engine
again. Continual cranking of the starter
motor will only result in its damage.

The en gine should now be run ning, and the
EPV16J is ready to be gin work.

Stabiliser Operation

Setting the stabilisers

The booms must be in the stowed po si tion.

En sure the Boom/Stabiliser Switch (item ƒ on the
ground con trol box) (see Fig ure 8.3) is set to sta bi -
lizer.

Lower the stabilisers by push

ing the in

di

vid

ual

valve le vers down (see Fig ure 8.4)

Figure 8.4

Lower the stabilisers and level the ma chine us ing
the level bub ble (see Fig ure 8.5) ad ja cent to the
con trol le vers.

Figure 8.5

page 8 - 2

EPV16J – 11089A

Chapter 8. Operation

CAUTION

CAUTION