beautypg.com

Synergy 8554 - 94-02 Dodge Truck Track-Bar Conversion Bracket User Manual

Parts list, Instructions

background image

SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397

INSTALLATION INSTRUCTIONS

8554 DODGE TRACK BAR CONVERSION BRACKET


Version 2.0

GENERAL NOTES:

These instructions are also available on our website at www.synergymfg.com. Check the website for any

updated instructions and additional photos for reference.

Bracket is designed to be bolted on with minimal grinding and drilling required.

Designed to be used in conjunction with PPM-8550-02 Adjustable Track Bar.

Installation requires the use of basic hand tools, a 4.5” angle grinder, and a drill with quality metal drill
bits.

PARTS LIST:

1 - PPM-8507 DODGE TB CONV BRKT

1 – 3/16” thick shim tab

2 - 1/2-13 UNC x 5" hex head bolt

2 -1/2" flat washers

1- 1/2-13 UNC stover nuts

1 - 5/16-18 UNC x 2.5" hex head bolt

1 - 5/16-18 UNC x 2.0" hex head bolt

2 - 5/16-18 UNC stover nuts

4 - 5/16" flat washers

1 - 9/16-12 UNC x 3" hex head bolt

1 - 9/16-12 UNC stover

2 - 9/16" flat washer

1 - 5/8-18 UNF x 2.5" hex head bolt

1 - 5/8-18 UNF nylock nut

1 - 5/8" flat washer

APPROXIMATE INSTALL TIME: 4-6 HOURS (Including track bar)

INSTRUCTIONS:

1) Begin by removing the axle side TB bolt. This is easiest to do when the truck is on the ground and the

weight of the vehicle is on the suspension.