JB Conversions 16-1204 HD Standard Length SYE Kit for the NP241 User Manual
Page 12

12
20) Place the chain around the front output sprocket and loop it
around the main drive sprocket. You will have to slightly lift the
mainshaft sprocket assembly to provide enough slack to get the front
sprocket into place (Fig.21).
FIG: 21
21) Install the retaining ring onto the front output shaft (Fig.22).
FIG: 22