Rock-Slide Engineering JEEP JK2 STEP SLIDER User Manual
Page 7
Installation Instruction RSEI 107
12. Remove the driver side dash panel and drill a 18mm hole in the panel to accommodate
the cutoff switch.
a. You can mount the cutoff switch in multiple positions. We recommend the dash
panel simply for the ease off access (see below)
13. Mount the ground from the plug to a metal surface behind the dash panel (see below).
14. Route the cutoff switch wires by running the POS+ and NEG- wires up the driver side
“A” pillar and plug them into the back of the cutoff switch.
15. Route the remaining POS+ and NEG- wires through the firewall on the driver’s side into
the engine compartment.
a. Make sure there is NO INTERFERENCE with any of the pedal linkage under the
dash
16. Route these wires along the firewall up to the battery compartment.
a. Secure the wires using the harness attached to the firewall
17. Attach the NEG- to the NEG- side of the battery.
18. Attach the POS+ to the POS+ side of the battery.
19. Position the actuating magnets on the catch side of each door.