beautypg.com

Ix system piping – Burnham CHG225 User Manual

Page 23

background image

23

Ix System Piping

A. General System Piping Precautions

CauTION

ThE hEaT ExChaNgEr usED IN ThE Chg Is maDE frOm a sPECIal alumINum allOy.

FAILuRE To TAkE THE FoLLoWING PRECAuTIoNS CouLD RESuLT IN SEVERE BoILER

DamagE aND wIll VOID ThE maNufaCTurEr’s warraNTy.

INSTALL BOILER SO THAT THE GAS IGNITION SYSTEM COMPONENTS ARE PROTECTED FROM WATER

(DRIPPING, SPRAYING, RAIN, ETC) DURING APPLIANCE OPERATION AND SERVICE (CIRCULATOR

REPLACEMENT, ETC).

OPERATION OF THIS BOILER IN A SYSTEM CONTAINING SIGNIFICANT AMOUNTS OF
DISSOLVED OXYGEN CAN CAUSE SEVERE HEAT EXCHANGER CORROSION DAMAGE.
USE ONLY ANTIFREEZE SPECIFICALLY PERMITTED ON PAGE 39 OF THIS MANUAL.
MAKE SURE THAT THE WATER USED TO FILL THE SYSTEM MEETS THE REqUIREMENTS OUTLINED

IN THE START-uP AND CHECkouT SECTION XI OF THIS MANUAL.

NEVER USE PETROLEUM BASED CLEANING OR SEALING COMPOUNDS IN THE BOILER SYSTEM.

THESE PRODUCTS COULD DAMAGE ELASTOMER SEALS AND GASKETS IN THE SYSTEM AND COULD

RESULT IN PROPERTY DAMAGE.

THIS BOILER IS NOT DESIGNED FOR USE IN SYSTEMS CONTAINING SIGNIFICANT AMOUNTS OF

MAKEUP WATER. REGULAR ADDITIONS OF MAKEUP WATER MAY CAUSE SEVERE HEAT EXCHANGER

DAMAGE.

BEFORE CONNECTING BOILER, MAKE SURE THAT THE SYSTEM IS FREE OF SEDIMENT, FLUX AND

ANY RESIDUAL BOILER WATER ADDITIVES. FLUSH THE SYSTEM IF NECESSARY TO ENSURE THAT

THESE CONTAMINATES ARE REMOVED.

MAINTAIN THE PRESSURE IN THE BOILER AT A MINIMUM OF 12 PSI.
DESIGN SYSTEM TO ENSURE THAT THE FLOW FALLS WITHIN THE LIMITS CALLED FOR IN TABLE 8.1.
THE MAxIMUM ALLOWABLE LOAD IS 20 kw (68 MBTU) PER CENTER SECTION AND 10 kw (34 MBTU)

PER END SECTION WITH LOAD BASED ON NET CALORIC VALUE. THIS EqUATES TO 75,000 BTU/HR

GROSS CALORIC INPUT FOR CENTER SECTION AND 37,500 BTU/HR GROSS CALORIC INPUT FOR AN

END SECTION.

MAxIMUM ALLOWABLE DELTA T BETWEEN SUPPLY AND RETURN DURING OPERATION IS 45°F AT

MAxIMUM LOAD AND 63°F AT MINIMUM LOAD.

THE PRODUCT SHALL AT ALL TIMES BE FILLED WITH CLEAN POTABLE WATER. THE ONLY

ALLOWABLE ADDITIVES ARE THE FERNOX PRODUCTS, ALPHI II (ANTI FREEZE), SUPERFLOC

(CLEANING), AND COPAL (ANTICORROSION) OR EqUIVALENTS. THE CHEMICAL ADDITIVES MUST

BE USED IN ACCORDANCE WITH THE CHEMICAL MANUFACTURERS RECOMMENDATIONS FOR USE

WITH ALUMINUM BOILERS AT ALL TIMES. THE pH OF THE SYSTEM HYDRONIC FLUID MUST BE

MAINTAINED BETWEEN 6.0 AND 8.5.

THE MINIMUM ALLOWABLE WATER FLOW BASED ON A 5/1 TURN DOWN RATIO FOR HEAT INPUT

WITH THE MINIMUM FLOW CORRESPONDING TO MINIMUM FIRING RATE HEAT INPUT IS AS

FOLLOWS; CHG3 - 3 GPM, CHG4 - 5 GPM

B. System Design

Proper operation of the CHG boiler requires that the water flow through the boiler remain within the limits shown in

Table 8.1 any time the burner is firing. Failure to maintain the flow within these limits could result in erratic operation

or premature boiler failure. There are three basic methods that can be used to pipe the CHG boiler. The instructions on

the following pages describe three alternative methods for piping CHG boilers and explain how to size the circulator

and piping for each one. Additional information on hydronic system design may be found in Installation of Residential

Hydronic Systems (Pub. #200) published by the Hydronics Institute in Berkeley Heights, NJ.

Table .1: Flow requirements Through Boiler

BOILER MODEL

MIN. REqUIRED FLOW

(GPM)

MAX. ALLOWABLE

FLOW (GPM)

CHG150

6

15

CHG225

9

23

This manual is related to the following products: