c. Measure time (in sec) for gas meter test dial to complete

1 revolution.

d. Refer to Table 9 for cu ft of gas per hr.

e. Multiply gas rate (cu ft/hr) X heating value (Btu/cu ft)

using natural gas heating value from local gas
utility/supplier.

EXAMPLE:
Btu heating input = Btu/cu ft X cu ft/hr
Heating value of gas = 975 Btu/cu ft
Time for 1 revolution of 2-cu ft dial = 70 sec
Gas rate = 103 cu ft/hr (from Table 9)
Btu heating input = 103 X 975 = 100,425 Btuh
In this example, the orifice size and manifold pressure
adjustment is within

±

2 percent of the furnace input

rate.

B.

Set Temperature Rise

CAUTION:

Temperature rise must be within limits

specified on unit rating plate. Recommended operation is
at midpoint of rise or above. Failure to follow this caution
may result in condensing or overheating the heat ex-
changers.

Determine and adjust air temperature rise as follows:

1. Place thermometers in return and supply ducts as close to

furnace as possible. Be sure thermometers do not see heat
exchanger so that radiant heat does not affect readings. This
practice is particularly important with straight-run ducts.

2. When thermometer readings stabilize, subtract return-air

temperature from supply-air temperature to determine air
temperature rise.

3. Adjust temperature rise by adjusting blower speed. Increase

blower speed to reduce temperature rise. Decrease blower
speed to increase temperature rise.

WARNING:

Disconnect 115-v electrical power before

changing speed tap. Failure to follow this warning could
result in personal injury.

4. To change blower motor speed selections for heating mode,

remove blower motor lead from control center HEAT
terminal. (See Fig. 27.) Select desired blower motor speed
lead from 1 of the other terminals and relocate it to HEAT
terminal. See Table 10 for lead color identification. Recon-
nect original lead on SPARE terminal.

Follow this same procedure for proper COOL speed selec-
tion.

C.

Blower Off Delay (Heat Mode)

The main blower off time delay period is factory-set at 135 sec and
is not field-adjustable.

D.

Set Thermostat Heat Anticipator

Thermostat heat anticipator must be set to match amp draw of
components in R-W circuit. Accurate amp draw measurements can
be obtained at thermostat subbase terminals R and W.

Fig. 42 illustrates an easy method of obtaining these measure-
ments. Amp reading should be taken after blower motor has
started. See thermostat manufacturer’s instructions for adjusting
heat anticipator and for varying heating cycle length.

TABLE 9—GAS RATE (CU FT/HR)

SECONDS

FOR 1

REVOLUTION

SIZE OF TEST DIAL

SECONDS

FOR 1

REVOLUTION

SIZE OF TEST DIAL

1

cu ft

2

cu ft

5

cu ft

1

cu ft

2

cu ft

5

cu ft

10
11
12
13
14

360
327
300
277
257

720
655
600
555
514

1800
1636
1500
1385
1286

50
51
52
53
54

72
71
69
68
67

144
141
138
136
133

360
355
346
340
333

15
16
17
18
19

240
225
212
200
189

480
450
424
400
379

1200
1125
1059
1000

947

55
56
57
58
59

65
64
63
62
61

131
129
126
124
122

327
321
316
310
305

20
21
22
23
24

180
171
164
157
150

360
343
327
313
300

900
857
818
783
750

60
62
64
66
68

60
58
56
54
53

120
116
112
109
106

300
290
281
273
265

25
26
27
28
29

144
138
133
129
124

288
277
267
257
248

720
692
667
643
621

70
72
74
76
78

51
50
48
47
46

103
100

97
95
92

257
250
243
237
231

30
31
32
33
34

120
116
113
109
106

240
232
225
218
212

600
581
563
545
529

80
82
84
86
88

45
44
43
42
41

90
88
86
84
82

225
220
214
209
205

35
36
37
38
39

103
100

97
95
92

206
200
195
189
185

514
500
486
474
462

90
92
94
96
98

40
39
38
38
37

80
78
76
75
74

200
196
192
188
184

40
41
42
43
44

90
88
86
84
82

180
176
172
167
164

450
439
429
419
409

100
102
104
106
108

36
35
35
34
33

72
71
69
68
67

180
178
173
170
167

45
46
47
48
49

80
78
76
75
73

160
157
153
150
147

400
391
383
375
367

110
112
116
120

33
32
31
30

65
64
62
60

164
161
155
150

TABLE 10–SPEED SELECTOR

COLOR

SPEED

FACTORY-

SHIPPED

CONNECTION

Black

High

Cool

Yellow (When Present)

Medium High

Spare

Blue

Medium Low

Heat

Red

Low

Spare

White

Common

Com

Fig. 42—Amp Draw Check with Ammeter

A80201

R

Y W G

10 TURNS

THERMOSTAT SUBBASE
TERMINALS WITH
THERMOSTAT REMOVED

HOOK-AROUND

VOLT/AMMETER

EXAMPLE:

5.0 AMPS ON AMMETER
10 TURNS AROUND JAWS

= 0.5 AMPS FOR THERMOSTAT SETTING

FROM UNIT 24-VOLT
TERMINAL BLOCK

—38—