PROGRAMMING THE BREWER (cont.)

SERVICE TOOLS (cont.)
Procedure to test components (outputs):
1. Place brew funnels into rails on both sides of

brewer.

2. Place a server beneath each brew funnel.
3. Press and hold the upper right hidden switch until

display reads UNITS. Release the switch. Continue
to press and release switch until SERVICE TOOLS
appears.

4. Press YES to run tests on various components

and outputs within the brewer. Pressing NO will
exit this function and advance to the next function
screen.

5. The display should read TEST OUTPUTS.
6. Press and release YES. The display should read

LEFT BREW VALVE.

7. To

test

LEFT BREW VALVE, press ON. If the brew

valve is functional, water should run from the left
brew side.

8. Press

OFF to end fl ow of water.

9. Press

NEXT to advance to the next component to

be tested.

NOTE: To bypass testing any component, press NEXT
to advance to the next one, without testing the previ-
ous component.

10. To test LEFT BYPASS, press ON. If the bypass

valve is functional, water should run from the left
brew bypass.

11. Press OFF to end fl ow of water.
12. Press NEXT to advance to the next component to

be tested.

13. To test LEFT FUNNEL LOCK, press ON. If the fun-

nel lock is functional, the lock will come down to
hold the funnel in place.

14. Press OFF to retract the funnel lock.
15. Press NEXT to advance to the next component to

be tested.

16. Follow steps 7 through 15 to test the right side

components.

17. To test REFILL VALVE, press ON. If the refi ll valve

is functional, the sound of the valve operating will
be heard.

18. Press OFF to end testing of refi ll valve.
19. Press NEXT to advance to the next component to

be tested.

20. To test TANK HEATERS, connect a voltmeter across

each of the tank heaters to check for voltage.

21. Press ON. The correct voltage should be present

at the heater terminals.

22. Press OFF to end testing of the tank heaters.

NOTE: The tank heater will automatically turn off if
left on too long.

23. After testing the tank heater, press NEXT to advance

to the next test.

24. The HEATER CONTACTOR is used only on certain

models. Check the machine schematic to see if the
contactor is present. Connect a voltmeter across a
tank heater that is operated by the contactor and
press ON to check that correct voltage is present.
Press OFF and confi rm the voltage is zero.

25. Press NEXT to return to TEST OUTPUTS.
26. To exit SERVICE TOOLS, press and release either

ON/OFF switch located on the front switch panel.
This will return to the MAIN SCREEN.

Procedure to test switches:

This function allows the operator to test the opera-

tion of the individual switches on the front panel.
1. Place brew funnels into rails on both sides of

brewer.

2. Place a server beneath each brew funnel.
3. Press and hold the upper right hidden switch until

display reads UNITS. Release the switch. Continue
to press and release switch until SERVICE TOOLS
appears.

4. Press YES to run tests on various components

and outputs within the brewer. (Pressing NO will
exit this function and advance to the next function
screen.)

5. The display should read TEST OUTPUTS.
6. In

TEST OUTPUTS screen, press NO. This advances

to TEST SWITCHES.

7. Pressing NO in this screen will advance to the

next function. Press YES in the TEST SWITCHES
screen to test the switches. The display will read
NOTHING PRESSED.

8. From this screen, press any of the switches on the

front of the brewer except the upper right hidden
switch. While the switch is pressed, the display
shows the name of that switch. If the name does
not appear, or if it remains after the switch has been
released, the switch is defective. Each switch can
be tested in this manner.

35058.1 071205