Water leakage test – Olympus PT-EP03 User Manual
Page 15

EN 14
En
Water Leakage Test
The final test after loading the camera is explained below. Always perform this test. It can be performed
easily in a water tank or a bathtub. The required time is about five minutes.
• At first, immerse the Case for only three seconds and check that no water drop etc. to the Case.
• Next, immerse the Case for 30 seconds and check that no water drop etc. to the Case.
• Furthermore, immerse the Case for three minutes.
• Check followings:
- check that no water has accumulated the Case.
- check that the Case is not clouded.
- check that no water has entered the Case.
• If inside of the Case becomes cloudy or there is a water drop, do the maintenance of the O-ring and
perform the water leakage test again.
PT-EP03_EN.Book Page 14 Wednesday, October 13, 2010 11:28 AM
- RG-1 (1 page)
- PT-043 (268 pages)
- PPO-E04 (80 pages)
- PTBK-E01 (16 pages)
- FL EC-14 (2 pages)
- f2.8-3.5 (2 pages)
- BLL-1 (1 page)
- PT-019 (38 pages)
- Motor Drive 2 (33 pages)
- BLM-1 (1 page)
- BLM-1 (2 pages)
- HLD-2 (2 pages)
- PT-036 (268 pages)
- CAMEDIA X-350 PT-021 (37 pages)
- ED11011F2.0 (2 pages)
- PPO-E01 (60 pages)
- PPO-E02 (60 pages)
- SHV-1 (11 pages)
- CAMERA HOUSING FL-50 (11 pages)
- ED14-42MM (22 pages)
- C-5500 (2 pages)
- PT-E02 (284 pages)
- PT-015 (39 pages)
- Zuiko Digital ED150mm f2.0 (8 pages)
- PT-026 (164 pages)
- S-HD-100 (2 pages)
- EP-1 (7 pages)
- PT-E05 (284 pages)
- PT-E05 (42 pages)
- Zuiko DIGITAL EC-20 (2 pages)
- Zuiko f3.5 (2 pages)
- PER-E01 (60 pages)
- VT1621-01 (202 pages)
- Zuiko Digital ED 9-18mm f4.0-5.6 (2 pages)
- PPO-E03 (60 pages)
- GS-2 (1 page)
- MCON 40 (2 pages)
- PPO-E05 (60 pages)
- Zuiko DIGITAL ED (5 pages)
- VT484501 (2 pages)
- ED35-100mm f2.0 (5 pages)
- PT-027 (180 pages)
- TCON-SA2 (2 pages)
- FLASH HIGH VOLTAGE SET FS-HV1 (30 pages)