WIKA DPT-10 User Manual
Page 60
A
B
+
1
5
6
7
+
–
2
4
3
II
I
III
III
Fig. 45: Preferred installation for liquids
I
DPT10
II
3
-fold valve block
III
Precipitator
1
.5 Drain valves
2
.4 Inlet valves
3
Breather valve
6
.7 Vent valves on DPT10
A, B Blocking valves
Proceed as follows:
1
Close valve 3
2
Fill measuring system with medium.
Open valves A, B, 2, 4: Medium flows in
If necessary, clean the differential pressure lines: - with gases by
blowing out with compressed air - with liquids by rinsing.
3)
For this purpose close valve 2 and 4, i.e. block the instrument.
Then open valve 1 and 5 so that the effective pressure lines blow
out/rinse.
After cleaning, close valves 1 and 5
3
Remove air from instrument:
Open valves 2 and 4: Medium flows in
Close valve 4: Minus side will be closed
Open valve 3: Equalisation plus and minus side
Briefly open valve 6 and 7, then close again: Fill the measuring
instrument completely with the medium and remove air
3)
Arrangement with 5 valves.
Installation for liquids
Prepare the adjustment
60
Differential pressure transmitter DPT10 - metal measuring diaphragm • Foundation Fieldbus
8 Set up
37246
-EN
-100120