Fig. 45: Preferred installation for liquids

I

DPT10

II

3

-fold valve block

III

Precipitator

1

.5 Drain valves

2

.4 Inlet valves

3

Breather valve

6

.7 Vent valves on DPT10

A, B Blocking valves

Proceed as follows:

1

Close valve 3

2

Fill measuring system with medium.

Open valves A, B, 2, 4: Medium flows in

If necessary, clean the differential pressure lines: - with gases by
blowing out with compressed air - with liquids by rinsing.

3)

For this purpose close valve 2 and 4, i.e. block the instrument.

Then open valve 1 and 5 so that the effective pressure lines blow
out/rinse.

After cleaning, close valves 1 and 5

3

Remove air from instrument:

Open valves 2 and 4: Medium flows in

Close valve 4: Minus side will be closed

Open valve 3: Equalisation plus and minus side

Briefly open valve 6 and 7, then close again: Fill the measuring
instrument completely with the medium and remove air

3)

Arrangement with 5 valves.

Installation for liquids