Ceiling Radiation Damper Installation (See Gemini/CRD
Installation Supplement)

Wiring Installation

All wiring should be in accordance with local ordinances

and the National Electrical Code, NFPA 70. Ensure the
power supply (voltage, frequency, and current carrying
capacity of wires) is in accordance with the motor name-
plate. Refer to the Wiring Diagrams, on page 4.

Lock off all power sources before unit is wired to
power source.

Follow the wiring diagram in the disconnect switch

and the wiring diagram provided with the motor. Cor-
rectly label the circuit on the main power box and
always identify a closed switch to promote safety (i.e.,
red tape over a closed switch).

Personal Safety

Disconnect switches are recommended. Place the

disconnect switch near the fan in order that the
power can be swiftly cut off in case of an emer-
gency, and in order that maintenance personnel are
provided complete control of the power source.

Side

Panel

Mounting

Brackets

Intake

Side Discharge

Exhaust

Duct Collar

Note: Allow for ceiling thickness. Allow 5/8” for premium aluminum grille

Suggested Installation: Unit without filter.

Note: Allow for ceiling thickness

Suggested Installation: Unit with filter

Figure 1

Figure 2

Figure 3

SEE NOTE

Screw

Grille

Filter

Mounting

Bracket

Allow 3/8"

for filter

SEE NOTE

Mounting

Bracket

Grille

Screw

Final Installation Steps

a. Inspect fasteners and setscrews, particularly fan

mounting fasteners, and tighten according to the rec-
ommended torque shown in the table,
Recommended Torque for Setscrews/Bolts.

b. Inspect for correct amperage and voltage with an

ammeter and voltmeter.

c. Ensure blower is secured to duct work.

d. Ensure all accessories are installed.

e. Inspect wheel-to-inlet clearance. Make sure wheel

does not rub against the inlet.

f. Test the fan to be sure the rotation is the same as indi-

cated by the arrow marked Rotation.

Operation

Pre-Start Checks

a. Lock out all the primary and secondary power sources.

b. Inspect fasteners and setscrews, particularly those

used for mounting the fan, and tighten if necessary.

c. Inspect motor wiring.
d. Ensure fan and ductwork are clean and free of debris.
e. Test the fan to ensure the rotation of the wheel is the

same as indicated by the rotation label.

f. Restore power to unit.

Start Up

Before attaching the grille, turn the fan on and inspect for

the following:

• Direction of rotation.
• Excessive vibration.
• Unusual noise.
• Motor noise.
• Improper motor amperage or voltage.
If a problem is discovered, immediately shut off the

fan. Lock out all electrical power and check for the
cause of the trouble. Refer to Troubleshooting,
page 3.

Inspection

Inspection of the fan should be conducted at the first 30

minute interval of satisfactory operation. During the
inspection, stop the fan and inspect as per directions
below.

30 Minute Interval

Inspect bolts, setscrews, and motor mounting bolts.
Adjust and tighten as necessary.

Grille Installation

Attach grille by tightening the screws with a screwdriver.

When the unit is furnished with a filter, place the screws
through the hole in the grille. Install the filter through the
holes provided in the filter frame.

Maintenance

Establish a schedule for inspecting all parts of the fan.

The frequency of inspection depends on the operating con-