beautypg.com

Installation, 4 commissioning – Karcher HD 7-250 De Tr1 User Manual

Page 70

background image

Aufstellung.pm6.5 - GB

Page 3.6

Installation

BOGE Operating instructions for CM 9 series screw compressor module

Commissioning
following extended
stoppages

Fig. 3.1:
Suction controller

ATTENTION!
Always check the rotational direction of the drive motor prior to commission-
ing/initial start up.
Even brief operation in the wrong direction of rotation (more than approx.
5 seconds) may cause total destruction of the air end!

Ensure that the rotational direction coincides with the rotational direction
arrow on the air end.

– Switch the compressor on and immediately off again to check the rota-

tional direction.

Undertake the following to prevent leaks:

– Check screw connection of the lines and retighten, if necessary.

If an extended stoppage is scheduled, you should contact BOGE-Service
beforehand.

Following an extended stoppage of more than 2 months, fill a small amount
of oil in the suction controller prior to starting the compressor.

ATTENTION!
Only fill the suction controller with the grade of oil used to operate the com-
pressor. Never mix different oil grades and brands.

CAUTION: Risk of injury!
Switch off main switch and secure against unintentional switching-on.

– Unscrew the plug on the suction controller .

– Fill approx.

1

/

4

l compressor oil into the suction controller.

– Reclose the controller using the plug.

– Turn compressor stage at the shaft by hand 5- to 10 times to spread the

oil evenly.

Checking
the rotational
direction

3.4

Commissioning

Checking for leaks

1

This manual is related to the following products: