beautypg.com

Installation, 3 installation – Karcher HD 7-250 De Tr1 User Manual

Page 69

background image

Aufstellung.pm6.5 - GB

Page 3.5

Installation

BOGE Operating instructions for CM 9 series screw compressor module

General

ATTENTION!
Only have the installation work carried out by appropriately trained persons
or specialists.

Prior to delivery, each Module CM 9 is subjected to a trail run at the factory.
It is carefully tested and set. However, possible transport damage cannot be
excluded.

– Please inspect the compressor immediately after delivery and direct dam-

age claims to the last haulier – even when the packing is not damaged!
To safeguard claims against the haulier we recommend leaving the
machine, devices and packing material in the same condition as they
were in when the damage was detected.

– Prior to commissioning, check the compressor for external damage.

– Observe the compressor very closely during commissioning and the

following trial run.

– If malfunctions occur, switch off the compressor immediately and inform

the BOGE-Service.

The delivery scope depends on your order.
Prior to commissioning, please check whether all required parts have been
provided. Please check the order confirmation for any possible accessory
equipment.

The delivery scope includes the following component parts:

– Operating instructions

– Oil drainage hose

– Head nut

BOGE compressors are supplied with a complete oil filling.

Prior to commissioning/start up, check the oil level as described in chapter
"Maintenance".

Checking
the delivery scope

3.3

Installation

Checking the oil level

This manual is related to the following products: