beautypg.com

Installation, 1 transport – Karcher HD 7-250 De Tr1 User Manual

Page 65

background image

Aufstellung.pm6.5 - GB

Page 3.1

Installation

BOGE Operating instructions for CM 9 series screw compressor module

General

Please observe the generally accepted safety and accident prevention regu-
lations when transporting the compressor. BOGE accepts no liability for
damage caused by improper transport!!

ATTENTION!
The compressor is delivered filled with oil.
Do not tilt during transport!

The CM 9-Module is designed for an operation in vertical positon. If the
place of installation is inclined by more than 10% (feet of the module) it is
necessary to contact BOGE to coordinate the further proceeding.

3.1

Transport

This manual is related to the following products: