beautypg.com

American Power Conversion 480kW400V User Manual

Page 8

background image

8

User Guide APC Silcon 480kW 400V UPS

990-4058

Stop/Start UPS and Operating the External Service Bypass

System start-up now completed.

NOTICE!

One of the following display messages will appear by UPS start-up:
• “STD”: Standard (single system)
• “PAR”: Parallel System
• “ECO”: Economy mode (single or parallel systems)
(Last message has priority over the other two)

kVA size (XXX) and the voltage reads:
• XXXkVA - 400 (380 or 415 Volt)

1. Check that the system has been in a stable environment for at least 12 hours enabling

any condensation to evaporate prior to start-up.

2. Open front door(s)

3. Switch on mains power by closing Q001

See notice below.

4. Wait for approx. 10 seconds

5. Press

on the keyboard

6. Press

on the keyboard

7. Wait for approx. 1 second

8. Wait for approx. 1 minute

9. Close MCCBs in Battery Breaker Box or Battery Cabinet

10. Press the green ON button

11. Close the front door(s)

Display shows

System type XXX

XXX kVA - XXX

Start charge DC

capacitors : YES

Data stored

Start charge DC

capacitors : YES

Insert fuse or

close MCCB

**System OFF**

Normal operation

load power XX%

Stop charge DC

capacitors : YES