beautypg.com

Allied Telesis AT-FS705LE User Manual

Page 37

background image

AT-FS705LE Installation Guide

25

Note

The switch perform a self-diagnostic test
upon power up. This takes about 20
seconds to complete.

8. Power ON the end-nodes connected to the

switch.

9. Check that all the LINK/ACT LEDs are

green. If any of the LEDs is OFF, refer to
“Troubleshooting” on page 27 for
instructions.

The switch is now ready for use.