beautypg.com

Powering on the switch – Allied Telesis AT-FS717FC/SC User Manual

Page 39

background image

AT-FS717FC/SC Fast Ethernet Switch Installation Guide

39

Powering On the Switch

The switch is ready for network operations.

To apply power to the AT-FS717FC/SC switch, perform the following
procedure:

1. Apply AC power to the switch by plugging the power cord into the AC

power connector on the back panel of the unit, as shown in
Figure 17.

Warning
Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord.

5

Caution

Use only safety licensed power supply cord.

Figure 17. Connecting AC Power Connector to a Switch

2. Plug the other end or the power cord into a wall outlet.

3. Power on the end-nodes.

4. Verify that the POWER LED is green. If the LED is OFF, refer to

“Installation” on page 25.

The switch is ready for network operations.

ˆ

Figure 18.

1134