Powering on the switch, Plugging in the ac power cord – Allied Telesis AT-GS950/48 User Manual
Page 41

AT-GS950/8, AT-GS950/16, AT-GS950/24 and AT-GS950/48 Switches Installation Guide
41
Powering On the Switch
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 15.
Figure 15. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.
E5
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 43.
The switch is now powered on and ready for network operations. For
information on how to manage the switch, refer to the AT-S107, AT-
S108, or AT-S109 Management Software User’s Guide.