beautypg.com

Powering on the switch, Plugging in the ac power cord – Allied Telesis AT-GS950/48 User Manual

Page 41

background image

AT-GS950/8, AT-GS950/16, AT-GS950/24 and AT-GS950/48 Switches Installation Guide

41

Powering On the Switch

To power on the switch, perform the following procedure:

1. Plug the power cord into the AC power connector on the back of the

switch, as shown in Figure 15.

Figure 15. Plugging in the AC Power Cord

2. Plug the other end of the power cord into a wall outlet.

Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.

E3

Note

Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.

E5

3. Verify that the POWER LED is green. If the LED is OFF, refer to

Chapter 3, “Troubleshooting” on page 43.

The switch is now powered on and ready for network operations. For
information on how to manage the switch, refer to the AT-S107, AT-
S108, or AT-S109 Management Software User’s Guide
.

This manual is related to the following products: