beautypg.com

Installing the switch in an equipment rack – Allied Telesis AT-GS950/48 User Manual

Page 32

background image

Chapter 2: Installation

32

Installing the Switch in an Equipment Rack

To install the switch in a standard 19-inch equipment rack, perform the
following procedure:

1. If the rubber feet are attached to the bottom of the switch, remove

them using a flat-head screwdriver.

2. Attach the two rack mount brackets to the sides of the switch using the

eight bracket screws that come with the unit. There are four possible
positions in which the brackets may be installed. See Figure 9 on page
35.

This manual is related to the following products: