Chapter 2, Installation, Chapte – Allied Telesis AT-GS950/48 User Manual
Page 25
![background image](/manuals/427249/25/background.png)
AT-GS950/8, AT-GS950/16, AT-GS950/24 and AT-GS950/48 Switches Installation Guide
25
Chapter 2
Installation
This chapter contains the following sections:
❒
“Reviewing Safety Precautions” on page 26
❒
“Selecting a Site for the Switch” on page 28
❒
“Cable Specifications” on page 29
❒
“Unpacking the Switch” on page 30
❒
“Installing the Switch on a Desktop” on page 31
❒
“Installing the Switch in an Equipment Rack” on page 32
❒
“Installing the Switch on a Wall” on page 35
❒
“Installing Optional SFP Transceivers” on page 37
❒
“Cabling the Switch” on page 40
❒
This manual is related to the following products: