Chapter 2: Installation

30

Unpacking the Switch

To unpack the switch, perform the following procedure:

1. Remove all of the components from the shipping package.

Note

Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.

2. Place the switch on a level, secure surface.

3. Verify that the shipping container includes the items listed in Figure 5

on page 30 in addition to your AT-GS950/8, AT-GS950/16, AT-GS950/
24 or AT-GS950/48 switch.

Figure 5. AT-GS950/xx Packing List

Two equipment rack or
wall brackets

Eight bracket screws

Four wall anchors

Four wall screws

Four rubber feet (for
desktop installation)

One regional AC power
cord

Two or four SFP slot dust
covers (pre-installed).