beautypg.com

Selecting a site for the switch – Allied Telesis AT-GS924M User Manual

Page 35

background image

AT-GS908M, AT-GS916M, and AT-GS924M Switches Installation Guide

35

Selecting a Site for the Switch

Observe the following requirements when choosing a site for your switch:

If you plan to install the switch in an equipment rack, verify that the
rack is safely secured and will not tip over. Devices in a rack should
be installed starting at the bottom, with the heavier devices near
the bottom of the rack.

If you are installing the switch on a table, verify that the table is
level and secure.

The power outlet for the switch should be located near the unit and
should be easily accessible.

The site should provide for easy access to the ports on the front of
the switch. This will make it easier for you to connect and
disconnect cables, as well as view the switch’s LEDs.

Air flow around the unit and through its vents on the side and rear
should not be restricted so that the switch can maintain adequate
cooling.

Do not place objects on top of the switch.

Do not expose the switch to moisture or water.

Ensure that the site is a dust-free environment.

You should use dedicated power circuits or power conditioners to
supply reliable electrical power to the network devices.

This manual is related to the following products: